A couple general updates this week in addition to the past and next 7 days schedule. Study Rooms Available in Talley With the fire separation walls complete on the 3rd floor, the study rooms and lounge (formerly CSLEPS, Campus Activities and Parents & Families Services offices) have been reopened. There are 6 rooms plus lounge…
Read MoreSchedule: Past 7 Days Existing Talley 1. Completed the 3rd and 4th floor separation walls 2. Completed the east side temporary stair erection (by Reynolds) 3. Cut the northeast building column - Blog post on the process: Digging a Little Deeper – Column Shoring and Extension 4. Started the north stairwell separation walls North of Talley –…
Read MoreNC State Students Transform Campus with University Dining RALEIGH, N.C. (April 18, 2012) – North Carolina State University engineering students are taking used fryer oil from two campus dining facilities and converting it into biodiesel fuel which is then being used in a variety of tractors and other off-road equipment. NC State’s Biofuel Research and…
Read MoreRALEIGH, N.C. and MINNEAPOLIS, MINN. (April 18, 2012) – North Carolina State University (NC State) and U.S. Bank have partnered to offer the Wolfpack One Card, a campus identification card that doubles as a prepaid MasterCard® card, to the incoming freshmen class in June 2012. Current students, faculty or staff members can upgrade starting in…
Read MoreRALEIGH, NC (April 18, 2012) – The NC State AllCampus Card office — and its ID card — have been renamed Wolfpack One, it was announced today by Dr. Dan Adams, associate vice chancellor for Campus Enterprises. The name change was precipitated by a new relationship with U.S. Bank that will enable two debit account…
Read MoreConstruction activity continues to increase. This includes activity at the Cates Avenue construction entrance. Please use caution when walking around the site and past construction entrances. Schedule: Past 7 Days Existing Talley 1. Completed the 2nd floor precast demolition 2. Completed the 2nd floor temporary corridor walls and ceiling 3. Continued the 3rd floor and…
Read More**Updated June 8, 2012 with Step 2 (cut column with excavated area and shoring) picture** This blog is a little different than our normal updates. It is a little more technical in nature. We thought that with some of the unique aspects of the project and NC State’s strong engineering programs, there was an opportunity…